Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

上海四喜机电自动化科技有限公司

工业自动化控制设备、楼宇智能化设备领域的技术开发、技术转让、技术咨询、技术服...

sell
  • There is no classification
contact
  • Contact:封工
  • Phone:021-34130358
  • Email:shsxjd@163.com
  • fax:021-54631123
search
 
link
  • There is no link yet
home > sell > MP105A4R repair EMERSON DC speed regulator repair
MP105A4R repair EMERSON DC speed regulator repair
products: Views:3MP105A4R repair EMERSON DC speed regulator repair 
brand: 艾默生EMERSON
price: 面议
MOQ:
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2015-06-19 09:05
 
Details
Maintenance of DC speed regulator (closing down)
Microsoft Yahei
DC speed regulator repair
Center repair common faults of DC speed regulator, no display, phase loss, overcurrent, overvoltage, undervoltage, overheating Overload grounding parameter error is displayed, no output module is damaged, replace accessories, etc.
Emerson high-performance DC drive repair common model DC drive repair DC drive repair DC speed regulator repair DC speed regulator repair DC speed regulator repair DC speed regulator Repair DC drive Repair DC drive repair DC drive repair DC drive repair DC drive repair DC drive repair
Maintenance process
The first step is to ask the user about the fault of the inverter.
The second step is to analyze the causes of such failures based on the user's fault description.
The third step is to open the repaired equipment, confirm the damaged components, and analyze the feasibility of repair and recovery.
The fourth step is to read and analyze the working principle of the circuit based on the working position of the damaged device to find out the cause of the damaged device.
The fifth step is to contact the customer, quote the repair price, and solicit the user’s repair opinions.
The sixth step is to find relevant components for replacement.
Step 7: After confirming that the inverter fault and its causes have been eliminated, power on and conduct the experiment.
Step 8: Enter the system when the inverter is working normally
Request for quotation
A total of0articles  Related Comments: